OVERVIEW The Toowoomba Second Range Crossing is a 41km road bypass route north of Toowoomba. Since the TSRC opened in September 2019, there has been a significant improvement to the traffic flow in the Toowoomba Region. The new road has diverted almost 80% of the heavy...

SITUATION Ageing Timber Bridges connecting the rail network in Central West Queensland meant that the rail line was at risk of being terminated. Local outback communities rely on the railway to transport their livestock, so terminating the railway would have devastating effects. Queensland Rail set out...

SITUATION Our client, Quickcell Technologies, require a strong lifting device to enable crane operators to lift 130 tonne concrete girders out of the moulds once they are set. CHALLENGES Create a 60 metre lifting beam in four separate 15 metre sections so that when aligned and assembled it...

Client: Skyway Joint Venture - BMD Constructions & CPB Contractors Location: Brisbane, QLD PROJECT OVERVIEW Brisbane Airports New Parallel Runway Project was an award-winning project Kenro is proud to be a part of. The Skyway JV delivered an impressive 3.3km runway as well as a 12km taxiway system....

The Peak Crossing pedestrian bridge over Purga Creek was one of the many bridges and other infrastructure in South East Queensland that fell victim to the devastating floods of January 2013. However thanks to a concerted effort by all concerned – The Scenic Rim Regional...

[vc_row row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern" css_animation=""][vc_column][vc_column_text]The $288 million Majura Parkway is the ACT’s single largest road infrastructure investment. Linking Canberra’s Federal Highway to the Monaro Highway, this new 11.5km dual carriageway is expected to be complete by 2016. The design incorporates a number of bridges...

[vc_row row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern" css_animation=""][vc_column][vc_column_text]Kenro Metal Services were recently involved in a trans-Australian project that was literally right on track. Mining giant Rio Tinto had commissioned Vossloh Cogifer Australia, part of the renowned global railway equipment supply group, to install a series of...

[vc_row row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern" css_animation=""][vc_column][vc_column_text]As a leading Queensland metal manufacturer, Kenro Metal Services have recently completed work on not one but two Powerlink substations in central Queensland. Engaged by FKG (FK Gardner & Sons)  who had originally been contracted by Downer Infrastructure, Kenro were...

[vc_row row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern" css_animation=""][vc_column][vc_column_text]The devastating floods of December 2010 and January 2011 brought horror to the Darling Downs community and unprecedented damage (almost $150 million) to the Toowoomba Regional Council's roads and bridges. Among the many bridges damaged were the Jellicoe Street...

[vc_row row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern" css_animation=""][vc_column][vc_column_text] Project: Award Winning Toogoolawah Pedestrian Bridge! Heavy Duty Balustrading Robust Mounting Brackets Bollards Project Value:                   $840k Project Duration:             16 Weeks Destroyed in January floods 2013, the all new Toogoolawah Pedestrian Bridge is now complete and in perfect working order! Kenro...